state – Michmutters
Categories
Australia

North-west Brisbane traffic and transport study draws heated debate between Labor state, LNP local governments

Queensland’s Transport Minister has described Brisbane City Council’s latest vision for a new toll road to relieve congestion in the city’s north-west as a “feeble fantasy” and a “farce”.

The six-lane tunnel, which would run between Bald Hills and connect with the Airport Link at Kedron, was part of the outcome of a $10 million federally-funded study undertaken over two years by the council.

It found northern Brisbane’s annual congestion and public transport crowding was costing $312 million per year.

That would rise to $538.5m by 2031 and $859m by 2041.

The study found significant community opposition towards any surface road or rail development through the North West Transport Corridor, which had been reserved by the state government since the 1980s.

Main Roads Minister Mark Bailey speaks to the media at a press conference on the Gold Coast on April 10, 2018.
Mr Bailey says the council had to cancel big projects yet released a study which recommended multi-billion-dollar road network infrastructure builds.(ABC News: Ashleigh Stevenson)

But Transport and Main Roads Minister Mark Bailey said the major toll road had been costed with “no funding, no consultation with other levels of government, and no idea how to fix congestion.”

He also criticized the council’s decision to cut projects in its June budget, citing the cost of rebuilding from February’s floods, yet unveil billions of dollars in new road infrastructure via the north-west transport study.

“Only a month ago, Lord Mayor Adrian Schrinner was saying the council was broke and had to cut a lot of projects citywide and now they have a plan to spend $25 billion on new tollways and motorways,” Mr Bailey said.

“It is very clear this tired 20-year-old council is out of touch and out of ideas.

Man with light blonde hair stands at reading with microphones
Cr Schrinner has defended the study saying it offered solutions to a growing problem.(ABC News: Alicia Nally)

“Recently, Lord Mayor Adrian Schrinner cut the North Brisbane Bikeway, cut upgrades to Mowbray Park, and refused to pay a fair share for the Cooper Plains level crossing removal because they are so broke, and yet here he is spending like a drunken sailor with his ridiculous $14 billion toll road plan.

“The state government had no input into the study that was funded by the former Morrison Government despite the state government owning the corridor which shows what a farce this announcement is.

“The immediate focus should be on upgrading services on Gympie Road, which we are already doing through the $72 million Northern Transitway project which we are fully funded.

“The study entirely ignores that project.

“Tell the Lord Mayor he is dreaming.”

‘Doing nothing not an option’

Yet, Cr Schrinner said the council had “done some planning work to assist” in reducing congestion in a burgeoning part of the city.

He also hit back at the state for setting aside land and not using it to improve transport networks.

artist impression of Gympie Rd transport upgrade
An artist’s impression shows a Gympie Rd precinct as part of north-west transport corridor improvement.(Supplied: Brisbane City Council)

“We’re concerned about what we see as a black hole for investment for infrastructure from the state government for the north-west suburbs,” Cr Schrinner said.

“That land was intended to be a transport corridor yet it has disappeared from any infrastructure plans and residents are asking what is going to happen in the north-western suburbs. The area is growing and there are no plans from the state government coming out.

.

Categories
Australia

North-west Brisbane transport woes could be solved by tunnel, bus network, study shows

The viability of a tunnel stretching nearly 12 kilometers from Bald Hills to Kedron and costing at least $9.5 billion is being investigated.

The six-lane tunnel, which would connect with the Airport Link, was part of the outcome of a $10 million federally-funded study undertaken over two years by Brisbane City Council.

It found northern Brisbane’s annual congestion and public transport crowding was costing $312 million per year.

That would rise to $538.5 million by 2031 and $859 million by 2041.

The study found significant community opposition towards any surface road or rail development through the North West Transport Corridor, which had been reserved by the state government since the 1980s.

A map showing the North West Transport corridor stretching from Everton Park north to Carseldine.
The North West Transport Corridor runs from Everton Park to Carseldine and is owned by the Queensland Government.(Supplied: Brisbane City Council)

Stretching from Carseldine to Alderley and including the Chermside Hills Reserve, the land was a “significant biodiversity corridor” likely to contain a number of observed threatened species, the study.

The North West Transport Network study investigated several underground alternatives, including a motorway and heavy rail option, as well as complementary above-ground bus and active transport solutions.

Bus network, another tunnel costed

Brisbane Civic Cabinet Chair for Infrastructure Andrew Wines said all levels of government needed to work together on transport solutions for Brisbane’s north.

“This study demonstrates that doing nothing isn’t an option,” Mr Wines said.

“Brisbane is the fastest growing capital city in the country and our northern neighbors in Moreton Bay are also growing quickly.

The study also assessed building a complementary Bus Rapid Transport system along Gympie Road from the Northern Busway at Kedron to Aspley at a cost of between $758 million and $1.1 billion.

A longer-term option of extending the underground motorway with an 11 kilometer tunnel from McDowall to Toowong by 2041 was also considered.

That tunnel was cost at between $7.8 billion and $11.5 billion.

Brisbane City Council Labor leader Jared Cassidy said Brisbane’s LNP council had announced a multi-billion dollar proposal “without saying when it will be funded”.

“It’s a bit rich for [Brisbane Mayor] Adrian Schrinner to put forward a multi-billion dollar proposal when his administration can’t even complete their own projects,” Mr Cassidy said.

“If this LNP administration can’t finish the North Brisbane Bikeway – how can it propose a multi-billion dollar plan for this North West motorway?

He said it was a proposal for a tolled tunnel.

“This is a backflip from the LNP,” he said.

“It is there in black and white – that the North West motorway will have tolled options considered.

“This plan is meant to be a missing link for the motorway network – but this council is missing the mark.”

Call for government cooperation

Mr Wines said the study had been sent to the federal and state governments, as well as Infrastructure Australia, for consideration.

“Clearly what has been put forward in this study is far beyond the means of local government,” he said.

“We are eager to talk further with the state and federal government about these proposals and hear about any other ideas they might have to deal with northern Brisbane’s transport needs.”

He said the study showed the economic cost of north Brisbane’s congestion would be $1.5 million a day within a decade which was “totally unacceptable”.

.